    1. ________ is called as a planned activity.
    A. Project
    B. Activity
    C. Program
    D. Task
    ANSWER: A
    2. ------------- project interfaces with the organization.
    A. information system
    B. embedded system
    C. process control system
    D. objective driven system
    ANSWER: A
    3. In product-driven projects, the objectives of the project are defined in terms of
    ___________.
    A. functional requirements only.
    B. resource and non-functional requirements.
    C. functional and quality requirements.
    D. resource requirements only.
    ANSWER: C

    Page 1

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    4. __________ is record of how much the organization is willing to spend on the
    system.
    A. Resource Requirements
    B. Functional Requirements
    C. Security Requirements
    D. Non Functional Requirements
    ANSWER: A
    5. Projects are __________ by definition and therefore more uncertain than normal
    undertakings.
    A. routine
    B. non-routine
    C. specific
    D. controllable
    ANSWER: B
    6. The project deliverable is supplied to customers release by release in a scheduled
    time intervals is referred as
    A. Agile
    B. Incremental Delivery
    C. V-Process Model
    D. Spiral Model
    ANSWER: B

    Page 2

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    7. Expand CCTA
    A. Center Combing and Technology agent
    B. Central Computer and Telecommunications Agency
    C. Center for Centralized and Technology Agent
    D. Center Computer and Technical Agency
    ANSWER: B
    8. _________ standards should be in place to ensure that changes to requirements are
    implemented in a safe and orderly way.
    A. Change control and configuration management
    B. Time control and configuration management
    C. Access control and configuration management
    D. Quality control and configuration management
    ANSWER: A

    Page 3

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    9. The organization as part of its monitoring and control policy may have a ________
    in place which dictates that certain statistics have to be collected at various stages of a
    project.
    A. measurement programme.
    B. system programme.
    C. software programme.
    D. testing programme.
    ANSWER: A
    10. The products handed over to the clients at the end of projects are called as
    _____________.
    A. software.
    B. application program.
    C. deliverables.
    D. intermediate products.
    ANSWER: C

    Page 4

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    11. The relationship between program design and program specification can be
    portrayed in _________.
    A. Data Flow Diagram
    B. Product Flow Diagram
    C. Network Diagram
    D. Data Flow Diagram
    ANSWER: B
    12. _________ time is the time between start and end of a task.
    A. Turnaround.
    B. Elapsed.
    C. Throughput.
    D. Pessimistic time.
    ANSWER: B
    13. _________ is the amount of work that needs to be done for every activity. A.
    Strength.
    B. Energy.
    C. Capacity.
    D. Effort.
    ANSWER: D

    Page 5

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    14. Project planning is an _________ process.
    A. continuous.
    B. iterative.
    C. time consuming.
    D. conventional.
    ANSWER: B
    15. _______ is a collection of projects that all contribute to the same overall
    organizational goals.
    A. Software.
    B. Task
    C. Programme.
    D. Activity
    ANSWER: C
    16. The standard way of evaluating the economic benefits of any projects is to carry
    out a ________ analysis.
    A. price-benefit.
    B. cost-benefit.
    C. cash flow.
    D. fund flow.
    ANSWER: B

    Page 6

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    17. The costs that include the salaries and other employment costs of the staff involved
    in the project development and all associated costs are called____________.
    A. operational cost.
    B. development cost.
    C. setup cost.
    D. direct cost.
    ANSWER: B
    18. Longer term benefits that are considered very difficult to quantify are called
    _______ .
    A. direct benefits.
    B. assessable benefits.
    C. indirect benefits.
    D. intangible benefits.
    ANSWER: D
    19. ____________ will indicate when expenditure and income will take place.
    A. Cash flow forecast.
    B. Cost analysis.
    C. Fund flow.
    D. Technical forecast.
    ANSWER: A

    Page 7

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    20. _________ is the time taken to break even or pay back the initial investment.
    A. Back period.
    B. Payback period.
    C. Cash back period.
    D. Rate of Return.
    ANSWER: B
    21. The calculation of __________ is a project evaluation technique that takes into
    account the profitability of a project and the timing of cash flows that are produced.
    A. NPV.
    B. TPV.
    C. SPV.
    D. LPV.
    ANSWER: A
    22. Number of interrelated activities can be organized in different ways are called
    ______.
    A. activity model.
    B. network model.
    C. hierarchical model.
    D. process model.
    ANSWER: D

    Page 8

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    23. RAD stands for _________.
    A. Resource Application Development.
    B. Resource Allocation Development.
    C. Rapid Application Development.
    D. Rapid Action Development.
    ANSWER: C
    24. JAD stands for ____________.
    A.Joint Action Development.
    B. J2ME Allocation Development.
    C. J2SE Application Development.
    D. Joint Application Development.
    ANSWER: D
    25. The alternate name for Waterfall model is _________.
    A. two-shot model
    B. phase shot model
    C. three-phase model
    D. one-shot model
    ANSWER: D

    Page 9

  • DNYANSAGAR ARTS AND COMMERCE COLLEGE, BALEWADI,PUNE 45
    MCQ SUb: Business Policy & Project M(601) class: bbaty vi sem
    Prof.Maya Jadhav www.dacc.edu.in
    26. The first phase of waterfall model is ____________.
    A. analysis.
    B. feasibility Study.
    C. coding.
    D. user requirements.
    ANSWER: B
    27. An Elaboration of Waterfall which stresses the necessity for validation
    activities is known as __________.
    A. extended Waterfall.
    B. iterative Model.
    C. V-Process model.
    D. spiral Model.
    ANSWER: C
    28. The spiral model is originated by __________.
    A. B.W.Boehm.
    B. B.W.Williams.
    C. B.W.Britto.
    D. B.W.Hackman.
    ANSWER: A

    Page 10

Download this file to view remaining 57 pages

logo StudyDocs
StudyDocs is a platform where students and educators can share educational resources such as notes, lecture slides, study guides, and practice exams.

Contacts

Links

Resources

© 2025 StudyDocs. All Rights Reserved.